We were awarded the contract for re-instating pedestrian crossings at Terminal 2 Manchester Airport. Systems installed previously had delaminated almost immediatley due to impervious nature of the brick paving. Surface was lightly ground with a diamond floor grinder before roller applying resin rich clear epoxy bonder which fully adhered to the surface, then overcoating with a two part epoxy colour to the walkway and lettering.