Selfridges in Manchester City Centre has polished up their men's and women's wear departments with a new floor. The carefully planned works took place leading up to the busy Christmas trading period. The curing time of the materials for this project was paramount as the shop floors are trafficked between the hours of 8am - 9pm.
The areas were prepared by means of STR machine with an abrasive pad, which was followed by isolated screed repairs. The specification was completed with two coats of high build epoxy (Fast Cure) applied with a lambs wool roller and paintbrush. Selfridges required a hardwearing surface with a high gloss finish.