TP Flooring's Recent/Previous Projects

  • TP Flooring Ltd
  • TP Flooring Ltd
  • TP Flooring Ltd
  • TP Flooring Ltd

Our administrative and supervisory teams oversee any project to facilitate its smooth running, at the same time guaranteeing that the optimum results for which we have become known are again matched. With the whole product market available to us, we're in a position to select the system best suited to both your particular needs and budget.

      Kaberry Construction - Oct 2019

TP Flooring & Coatings Ltd were awarded the flooring contract at the New Tool Station in Bolton. The programme of works consisted of preparation of the existing floor surface by means of vacuum assisted diamond floor grinder, localised screed repairs and then the installation of Flowcrete's Hydroseal DPM, Flowscreed Industrial Top at a nominal thickness of 6mm and followed by a clear polyaspartic seal coat as specified.  All works were completed to a high standard within the desired time frame and to the clients satisfaction. Please see below attached pictures showing the floor condition before and after installation.

    Private Residence - Sept 2019

The contract was for the installation of a 3mm SL screed with a decorative flake system - Area of 28 SqM. The programme of works consisted of preparation of the existing floor surface by means of vacuum assisted diamond floor grinder, localised screed repairs and then the installation of an epoxy self-leveller at a nominal thickness of 3mm, followed by a full blind with PVA flakes, and finally a scatch resistant top clear seal coat. All works were completed to a high standard and to the clients satisfaction. Please see below attached pictures showing the floor condition before and after installation.

       British Vita Ltd - Aug/Sept 2019

TP Flooring Ltd were awarded the contract for the installation of an epoxy self-levelling system to the new clean room area at British Vita Ltd based over in Accrington, Lancashire. Works comprised of a vacuum blast preparation, two coats of an epoxy binder primer followed by the installation of a 3mm epoxy SL iin various colours as required. All works were successfully completed to a high standard within the required time frame and to the clients satisfaction.  Please see below attached pictures after the floor was installed. 

         Northern Rail at Allerton Depot - Aug/Sept 2019

TP Flooring Ltd were awarded the contract for resin coating to floors and walls for Northern Rail at their Allerton Depot in Liverpool. Specification allowed for diamond grind preparation to both walls and floor, followed by one coat of pigmented DPM and two coats of a two-pack high build epoxy floor coating. All floors incorporated aluminium oxide aggregate to give the required degree of non-slip. All works were completed to a high standard and to the clients satisfaction. Please see below attached pictures of the floor condition before and after installation. 

                   J. Edgar & Son, Cumbria - July 2019

TP Flooring Ltd were awarded the contract for the installation of resin flooring to two workshop areas. The programme of works consisted of preparation of the existing floor surface by means of a 3 phase triple head floor grinder, carrying out any small localised screed repairs required prior to application of a damp proof membrane, followed by two coats of a high build epoxy resin incorporting a non-slip finish. Demarcation lines in both white and safety yellow were also installed. All works were completed to a high standard and to the clients satisfaction. Please see below attached pictures showing the floor condition before and after installation.

         Urban Splash - June 2019

TP Flooring Ltd were awarded the contract for the installation of resin flooring. The programme of works consisted of preparation of the existing floor surface by means of vacuum blasting, carrying out any small localised screed repairs required prior to application of high build epoxy resin floor coatings. All works were completed to a high standard and to the clients satisfaction. Please see below attached pictures showing the floor condition before and after installation.

               Sun Chemicals Ltd - May 2019

TP Flooring Ltd were awarded the contract for installation of resin flooring to the water based department at Sun Chemicals Ltd in Rochdale. All works were completed to a high standard and to the clients satisfaction which has led to the subsequent award for the contract of works scheduled for this August. Please see below for pictures detailing the floors condition before and following installation.

       Fords of Winford - May 2019

TP Flooring Ltd were awarded the resin surfacing contract by Fords of Winford in their new bodyshop premises. The programme of works comprised; preparing the existing floor surface by means of vacuum blasting and carry out any small localised screed repairs where required, followed by the application of high build epoxy resin floor coatings in various colours as requested. Images before works commenced and following completion of the above works are shown below.  All works were completed to a high standard and to the clients satisfaction.

Restaurant Wholesale Warehouse - Manchester - October 2018

TP Flooring Ltd were awarded the contract for removing the existing surface coating and fully diamond grinding of the concrete substrate prior to the installation of a high build fast cure epoxy resin floor coating. All works were completed between the hours of 19:00 and 02:00 to allow sufficient curing time of the material in order to permit customer access by 09:00, and thereby accommodate workflow efficiency and access. All works were completed to a high standard and to the clients satisfaction. See attached pictures showing the floor condition before and after installation.

Salford College - Salford - August 2017

TP Flooring Ltd were awarded the contract for resin flooring to Salford College, Skill Centre and was completed to the clients entire satisfaction see attached pictures which shows condition of the surface before and after.

Caligen Foam - Accrington June 2017

Bowlands Brewery Clitheroe - May 2017

We were appointed the works by the brewery to carry out the following. preparation using scan master 450 with vacuum attachment removed all surface laitance and vacuumed all arisings. We than applied one coat of Resucoat HB in Kingfisher Blue allowed the coating to cure overnight and then applied a 2nd coat of Resucoat HB and scattered a quartx aggregate into the coating leaving a non slip surface.

West CNR Corner Cocktail Bar - NQ, Manchester in April'17

Pilgrim International - Oldham - April 2017

We carried out the following works in April, prepared the floor by using scan master 450, our client wanted to re-vamp the walkways and lay a small 30 sqm self smoothing floor with a non slip finsih, we applied two coats of Resucoct HB in Salsa Red and finished off the demartkation lines in yellow.

Cromwell Arms -Hampshire - March 2017

Trilanco - Preston - August 2016

Manchester & Cheshire Dogs Home - July 2016

TP Flooring were awarded the refurbishment contract for all the existing kennels at Manchester and Cheshire dogs Home. A quartyz screed with coving was used, the contract was successfully completed and within the required time frame.

Progressive 3PL - Bredbury - June 2016

TP Flooring were awarded a flooring contract by SEC Storage for a warehouse in Bredbury, Stockport - Area 2000 sq metres incorporating walkways. The area was prepared by vacuum controlled diamond grinding followed by two coats of high build two pack epoxy incorporating a scatter of aluminium oxide to give the required degree of non slip.

Sun Chemical - Normanton - May 2016

TP Flooring Ltd were awarded the contract for removing the existing surface coating and fully diamond grinding of the concrete substrate prior to the installation of a high build fast cure epoxy resin floor coating. All works were completed between the hours of 19:00 and 02:00 to allow sufficient curing time of the material in order to permit customer access by 09:00, and thereby accommodate workflow efficiency and access. All works were completed to a high standard and to the clients satisfaction. See attached pictures showing the floor condition before and after installation.

Tesla Motors - Solihull - May 2016

We were awarded the flooring contract for Tesla Motors at Touchwood Shopping Centre, Solihull being the first car park service centre for Tesla Motors in the UK. Work comprised of diamond grind preparation and the installation of a 3mm epoxy SL in Tesla company colours with a non slip aggregate finish. All works satisfactory completed and orders have now been placed for Bluewater Shopping Centre and Bristol.

Ellenby Construction - February 2016

Unit refurbishment in Bolton, remove sections of the bed, diamond grind preparation and install an epoxy SL to achieve required levels with remaining floor. All works completed satisfactory over a weekend period.

Bourne Construction Twickenham - January 2016

Industrial floor in Twickenham London which allowed for vac-blast preparation and extensive resin floor repairs using epoxy resin mortar and self levelling epoxy. Floor finish epoxy bonder primer followed by two coats of high build solvent free two pack epoxy.

Dominion Print Ltd - Bradford - December 2015

A composite resin floor system was installed which involved enclosed vacuum blast preparation, one coat of epoxy bonder primer fully blinded with aluminium oxide, over coated with one coat of high build two pack epoxy and again fully blinded in aluminium oxide. A final coat of high build two pack epoxy was then applied as the finishing coat to provide an extremely hard wearing surface with excellent non-slip characteristics. Area completed 1900 Sq. metres.

RAF Lakenheath - November 2015

TP Flooring were awarded the contract in 2015 for the installation of a flexible resin system to the plant room floors providing a fully tanked and sealed surface. All works were successfully completed and additional areas have now been added, which means it is an ongoing contract for our Company.

Thomas Cook - M/cr Airport - July 2015

Installation of Resucoat HB which is a high build two pack solvent epoxy incorporating a non alip aggreagte to loading bay areas and aisleways. Yellow line markings installed using Resuline epoxy line markings.

Sorrell Group - Salford - June 2015

Installation of vinyl and carpet throughout the Sorrell Group Ptactice which is a NHS doctors surgery based in Salford.

Pedestrian Crossing at Terminal 2 Manchester Airport - June 2015

We were awarded the contract for re-instating pedestrian crossings at Terminal 2 Manchester Airport. Systems installed previously had delaminated almost immediatley due to impervious nature of the brick paving. Surface was lightly ground with a diamond floor grinder before roller applying resin rich clear epoxy bonder which fully adhered to the surface, then overcoating with a two part epoxy colour to the walkway and lettering.

Manchester Airport - Baggage Hall - March 2015

Installation of non slip resin flooring to the above

September 2014 - AKW Transportation, Trafford Park, Manchester

We were awarded the contract for epoxy resin flooring at the above site. The new warehouse facility measures 16,000 sq metres. All areas were vacuum blasted which cleaned the surface and also exposed any weakness within the existing floor. In the areas of weakness A320 floor planer with a fine mulling drum was used to reduce the floor surface by 6mm or until a sound substrate was found. Areas of repair were then back filled with an epoxy resin screed and brought back to a smooth surface finish.


Joints were re-cut into the floor and back filled with a two part flexible jointing compound. Once all repairs were completed the surace received one coat of epoxy primer followed by two coats of high epoxy incorporating a 36 grade aluminium oxide to give the required degree of non slip

Flurocarbon - Irlam - Salford - March 2014

TP Flooring were awarded the above contract to carry out enclosed vacuum blast prepartion, locliased screed repairs, one coat of epoxy two pack primer followed by two coats of high build two apck epoxy. All works completed within required tiem frame and since we have completed resin flooring for their sister company in Northampton FBS Prestige Ltd.

Blackburn Town Hall Steps

British Vita - Accrington

We were awarded the contract for floor repairs and resin coatings at the above site. Three factory areas 3,900 sq metres. Distrinctive colours too identify working areas, FLT routes and walkways.

Thomas Cook - Hangar Floor

We were awarded the contract for resin flooring to the Aircraft Maintenance Hanger at Manchester Airport PLC. A non slip resin surface was installed with chemical resistance to aviation fuels. Area 12,000 sqm.

Missguided Fashion - Trafford Park

TP Flooring Ltd

The Solution

With TP Flooring & Coatings having over two decades of experience, Missguided turned them, to provide a solution to upgrade the existing warehouse floor.

TP Flooring meet with Missguided in order to gain a full understanding of their individual requirements, timescale and to provide advice on the most appropriate specification. From these discussions a high performance resin coating was chosen as it was seen as providing the required speed of application in addition to providing a floor fully fit for their ongoing purposes.

The concrete was vacuumed shot blasted, a clean dust free process. The edges were prepared with a diamond grinder, providing a textured surface suitable for the application of coating. Once complete a high performance resin coating was installed over two applications. The preparation works and the coatings needed to be applied within a tight timescale in order that the floor would be ready for the installation of the warehouse racking. This stringent schedule was achieved through the organisation, skill and experience of TP Flooring. Missguided was delighted with the finished product and the performance of TP Flooring throughout the process.

The Testimonial

Brett Leadley-Kramer, Operations Manager for Missguided, said: “The whole project was excellently handled by Derek Hopkins and the advice we got at the time was invaluable. After having a free survey completed a date was arranged for installation. The team was given a budget that they worked to and took on board the requirements for the new floor that would complement the facility, which had to be a bright statement to go well with the company”.

Manchester Int Airport 

Terminal 1

TP Flooring Ltd

We recently completed a project at Manchester International Airport Terminal 1. The task was carefully planned to accommodate the logistics of a busy International Airport. We provided a flooring specification with fantastic anti-slip characteristics to handle the high volume of pedestrian and vehicle traffic at Terminal 1 Departures. Manchester Airport was looking to refurbish adjacent roadways to lift the profile of the Terminal.

Following extensive surface preparation including floor planning and shot blasting to create a mechanically key to both concrete and tarmac substrates. TP Flooring and Coatings Ltd epoxy resin system incorporating various graded quartz aggregate to complete the project

Selfridges in 

Manchester

Selfridges

Selfridges in Manchester City Centre has polished up their men's and women's wear departments with a new floor. The carefully planned works took place leading up to the busy Christmas trading period. The curing time of the materials for this project was paramount as the shop floors are trafficked between the hours of 8am - 9pm.

The areas were prepared by means of STR machine with an abrasive pad, which was followed by isolated screed repairs. The specification was completed with two coats of high build epoxy (Fast Cure) applied with a lambs wool roller and paintbrush. Selfridges required a hardwearing surface with a high gloss finish.

Resin 

Flooring

Resin flooring

The services of TP flooring and Coatings Ltd were employed for the installation of resin flooring to a Rotatives Engineering Workshop. Hardwearing epoxy systems and non-slip surfaces in specific areas have been successfully installed. Work is continuing through various Engineering Departments at the Derby site.

Website powered by BT