Restaurant Wholesale Warehouse - Manchester - October 2018

TP Flooring Ltd were awarded the contract for removing the existing surface coating and fully diamond grinding of the concrete substrate prior to installing a high build fast cure epoxy resin floor coating. All works were completed between the hours of 19:00 and 02:00 to allow sufficient curing time of the material in order to permit customer access by 09:00, and thereby accommodate workflow efficiency and access. All works were completed to a high standard and to the clients satisfaction. See attached pictures showing the floor condition before and after installation. 




Salford College - Salford - August 2017


TP Flooring Ltd were awarded the contract for resin flooring to Salford College, Skill Centre and was completed to the clients entire satisfaction see attached pictures which shows condition of the surface before and after.

TI Simpson (farms) Ltd - Redditch - July 2017

Caligen Foam - Accrington June 2017

Stretford Motorway - June 2017

Volex - Leigh - May 2017

TP Flooring successfully completed the installation of epoxy resin flooring to the Leigh Works of Volex. Vac blast preparation and diamond grinding, one coat of epoxy primer and two coats of high build epoxy completed over an area of 8,000 sq metres within a very tight time frame. Clients requirements were satisfied and they were extremly pleased with the final finish.

Bowlands Brewery Clitheroe - May 2017

We were appointed the works by the brewery to carry out the following. preparation using scan master 450 with vacuum attachment removed all surface laitance and vacuumed all arisings. We than applied one coat of Resucoat HB in Kingfisher Blue allowed the coating to cure overnight and then applied a 2nd coat of Resucoat HB and scattered a quartx aggregate into the coating leaving a non slip surface.

West CNR Corner Cocktail Bar - NQ, Manchester in April'17

West CNR Corner Cocktail Bar 3

Pilgrim International - Oldham - April 2017

We carried out the following works in April, prepared the floor by using scan master 450, our client wanted to re-vamp the walkways and lay a small 30 sqm self smoothing floor with a non slip finsih, we applied two coats of Resucoct HB in Salsa Red and finished off the demartkation lines in yellow.

Pilgrim International 4 Pilgrim International 4

Cromwell Arms -Hampshire - March 2017

Head of the River - Oxford - February 2017

Trilanco - Preston - August 2016

Manchester & Cheshire Dogs Home - July 2016

TP Flooring were awarded the refurbishment contract for all the existing kennels at Manchester and Cheshire dogs Home. A quartyz screed with coving was used, the contract was successfully completed and within the required time frame.

Progressive 3PL - Bredbury - June 2016

TP Flooring were awarded a flooring contract by SEC Storage for a warehouse in Bredbury, Stockport - Area 2000 sq metres incorporating walkways. The area was prepared by vacuum controlled diamond grinding followed by two coats of high build two pack epoxy incorporating a scatter of aluminium oxide to give the required degree of non slip.

Progressive 3PL - Bredbury

Sun Chemical - Normanton - May 2016

Non slip MMA fast cure resin flooring for steps amd ramps outside reception. Due to fast cure nature of the product all works were completed in one working day and can be fully trafficked after 1 hour.

Sun Chemical - Normanton 1 Sun Chemical - Normanton 2

Tesla Motors - Solihull - May 2016

We were awarded the flooring contract for Tesla Motors at Touchwood Shopping Centre, Solihull being the first car park service centre for Tesla Motors in the UK. Work comprised of diamond grind preparation and the installation of a 3mm epoxy SL in Tesla company colours with a non slip aggregate finish. All works satisfactory completed and orders have now been placed for Bluewater Shopping Centre and Bristol.

Ellenby Construction - February 2016

Unit refurbishment in Bolton, remove sections of the bed, diamond grind preparation and install an epoxy SL to achieve required levels with remaining floor. All works completed satisfactory over a weekend period.

Bourne Construction Twickenham - January 2016

Industrial floor in Twickenham London which allowed for vac-blast preparation and extensive resin floor repairs using epoxy resin mortar and self levelling epoxy. Floor finish epoxy bonder primer followed by two coats of high build solvent free two pack epoxy.

Dominion Print Ltd - Bradford - December 2015

A composite resin floor system was installed which involved enclosed vacuum blast preparation, one coat of epoxy bonder primer fully blinded with aluminium oxide, over coated with one coat of high build two pack epoxy and again fully blinded in aluminium oxide. A final coat of high build two pack epoxy was then applied as the finishing coat to provide an extremely hard wearing surface with excellent non-slip characteristics. Area completed 1900 Sq. metres.

RAF Lakenheath - November 2015

TP Flooring were awarded the contract in 2015 for the installation of a flexible resin system to the plant room floors providing a fully tanked and sealed surface. All works were successfully completed and additional areas have now been added, which means it is an ongoing contract for our Company.

RAF Lakenheath RAF Lakenheath 2

Tesla Motors - Stockport - November 2015

The new all electric car from Tesla is being launched in Stockport. TP Flooring & Coatings Ltd were awarded the contract for the installation of a non slip resin flooring to the new workshop, stores and a 3mm self levelling epoxy to the delivery area. All successfully completed.

Tesla Motors - Stockport 1 Tesla Motors - Stockport 2

CRP Ltd - Rochdale - October 2015

Build up of existing coatings had to be removed back to original slab by vacuum blasting and diamond grinding. Epoxy bonder primer and two coats of high build epoxy were installed with demarkation lines. Zebra crossing to the outside

Pyramid - Trafford Park- October 2015

Non slip resin flooring completed for Pyramid in Trafford Park illustrations show before and after.

Thomas Cook - M/cr Airport - July 2015

Thomas Cook - M/cr Airport 1 Thomas Cook - M/cr Airport

Installation of Resucoat HB which is a high build two pack solvent epoxy incorporating a non alip aggreagte to loading bay areas and aisleways. Yellow line markings installed using Resuline epoxy line markings.

Manchester City Centre - July 2015

Manchester City Centre Manchester City Centre 2

An epoxy resin screed to pavement area in Manchester City Centre to cover irregularities in the glass block paving, Thus eliminating any health & safety issues.

Sorrell Group - Salford - June 2015

Installation of vinyl and carpet throughout the Sorrell Group Ptactice which is a NHS doctors surgery based in Salford.

Pedestrian Crossing at Terminal 2 Manchester Airport - June 2015

We were awarded the contract for re-instating pedestrian crossings at Terminal 2 Manchester Airport. Systems installed previously had delaminated almost immediatley due to impervious nature of the brick paving. Surface was lightly ground with a diamond floor grinder before roller applying resin rich clear epoxy bonder which fully adhered to the surface, then overcoating with a two part epoxy colour to the walkway and lettering.

Pedestrian Crossing

Manchester Airport - Baggage Hall - March 2015

Installation of non slip resin flooring to the above

Manchester Airport - Baggage Hall

Manchester Airport T1 - February 2015

Completion of repairs to the multi storey car park at Manchester Airport using Polyaspartic fast cure epoxy resin flooring this has proved successful and TP Flooring Ltd has been awarded a further contract for T2

Chevron Ltd - February 2015

Installation of white line marking to the above site.

Mercedes - Birmingham - January 2015

First phase - completion of preparation for Epoxy resin flooring.

Manchester City New Training Academy - January 2015

Awarded the contract from Bam Construction Completion of a non-slip epoxy resin coatings to concession stands and toilets amenities at the above.

September 2014 - AKW Transportation, Trafford Park, Manchester

We were awarded the contract for epoxy resin flooring at the above site. The new warehouse facility measures 16,000 sq metres. All areas were vacuum blasted which cleaned the surface and also exposed any weakness within the existing floor. In the areas of weakness A320 floor planer with a fine mulling drum was used to reduce the floor surface by 6mm or until a sound substrate was found. Areas of repair were then back filled with an epoxy resin screed and brought back to a smooth surface finish.


Joints were re-cut into the floor and back filled with a two part flexible jointing compound. Once all repairs were completed the surace received one coat of epoxy primer followed by two coats of high epoxy incorporating a 36 grade aluminium oxide to give the required degree of non slip

AKW Transportation 1 AKW Transportation 2

Flurocarbon - Irlam - Salford - March 2014

TP Flooring were awarded the above contract to carry out enclosed vacuum blast prepartion, locliased screed repairs, one coat of epoxy two pack primer followed by two coats of high build two apck epoxy. All works completed within required tiem frame and since we have completed resin flooring for their sister company in Northampton FBS Prestige Ltd.

Flurocarbon - Irlam 1

Country Attire - Stockport - February 2014

Installation of Damp proof membrane and two coats of high build flooring at the above distribution warehouse.

Country Attire - Stockport 1 Country Attire - Stockport 2

Blackburn Town Hall Steps

Blackburn Town Hall Steps Blackburn Town Hall Steps 2

Manchester International Airport Terminal 1

Manchester International Airport

We recently completed a project at Manchester International Airport Terminal 1. The task was carefully planned to accommodate the logistics of a busy International Airport. We provided a flooring specification with fantastic anti-slip characteristics to handle the high volume of pedestrian and vehicle traffic at Terminal 1 Departures. Manchester Airport was looking to refurbish adjacent roadways to lift the profile of the Terminal.

Following extensive surface preparation including floor planning and shot blasting to create a mechanically key to both concrete and tarmac substrates. TP Flooring and Coatings Ltd epoxy resin system incorporating various graded quartz aggregate to complete the project

Selfridges in Manchester

Selfridges

Selfridges in Manchester City Centre has polished up their men's and women's wear departments with a new floor. The carefully planned works took place leading up to the busy Christmas trading period. The curing time of the materials for this project was paramount as the shop floors are trafficked between the hours of 8am - 9pm.

The areas were prepared by means of STR machine with an abrasive pad, which was followed by isolated screed repairs. The specification was completed with two coats of high build epoxy (Fast Cure) applied with a lambs wool roller and paintbrush. Selfridges required a hardwearing surface with a high gloss finish.

Resin flooring

Resin flooring

The services of TP flooring and Coatings Ltd were employed for the installation of resin flooring to a Rotatives Engineering Workshop. Hardwearing epoxy systems and non-slip surfaces in specific areas have been successfully installed. Work is continuing through various Engineering Departments at the Derby site.

Bakery in Accrington

TP flooring & Coatings ltd were awarded by the construction Company Clement Dickens & Sons for the installation of a 6mm RT non slip resin screed, supplied and laid 930sqm.

Bakery in Accrington 1 Bakery in Accrington 2

Missguided Fashion - Trafford Park

The Solution

With TP Flooring & Coatings having over two decades of experience, Missguided turned them, to provide a solution to upgrade the existing warehouse floor.

TP Flooring meet with Missguided in order to gain a full understanding of their individual requirements, timescale and to provide advice on the most appropriate specification. From these discussions a high performance resin coating was chosen as it was seen as providing the required speed of application in addition to providing a floor fully fit for their ongoing purposes.

The concrete was vacuumed shot blasted, a clean dust free process. The edges were prepared with a diamond grinder, providing a textured surface suitable for the application of coating. Once complete a high performance resin coating was installed over two applications. The preparation works and the coatings needed to be applied within a tight timescale in order that the floor would be ready for the installation of the warehouse racking. This stringent schedule was achieved through the organisation, skill and experience of TP Flooring. Missguided was delighted with the finished product and the performance of TP Flooring throughout the process.

The Testimonial

Brett Leadley-Kramer, Operations Manager for Missguided, said: “The whole project was excellently handled by Derek Hopkins and the advice we got at the time was invaluable. After having a free survey completed a date was arranged for installation. The team was given a budget that they worked to and took on board the requirements for the new floor that would complement the facility, which had to be a bright statement to go well with the company”.

Missguided Fashion

Thomas Cook - Hangar Floor

We were awarded the contract for resin flooring to the Aircraft Maintenance Hanger at Manchester Airport PLC. A non slip resin surface was installed with chemical resistance to aviation fuels. Area 12,000 sqm.

Thomas Cook - Hangar Floor Thomas Cook - Hangar Floor 2

British Vita - Accrington

We were awarded the contract for floor repairs and resin coatings at the above site. Three factory areas 3,900 sq metres. Distrinctive colours too identify working areas, FLT routes and walkways.

British Vita - Accrington 1 British Vita - Accrington 2 British Vita - Accrington 3

About us

Providing professional installation and complete maintenance programmes on all high performance industrial floorings, includes the laying of new systems to the repair and remedial work on damaged and worn floors. Please contact our friendly expert team today on 0161 728 4625